Go Back   RisingUp Aviation Forums > Welcome Area > The Hangar
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read


The Hangar Chit-Chat, comment on this website, aviation humor, etc. It's aviation related and no forum for it below? Post it here!

Reply
 
LinkBack Thread Tools Rate Thread Display Modes
  #1 (permalink)  
Old 01-20-2008, 03:59 PM
tewels tewels is offline
New Member
 
Join Date: Jan 2008
Location: Arizona
Posts: 1
tewels is on a distinguished road
Cessna master relay replacement

I have a 182 and need to replace my battery relay. Can I install a replacement relay from A/C Spruce or do I need to install a factory unit....tewels
Reply With Quote
  #2 (permalink)  
Old 01-21-2008, 09:20 AM
Denny of Oakland Denny of Oakland is offline
Super Member
 
Join Date: Oct 2002
Location: Oakland, California
Posts: 417
Denny of Oakland is on a distinguished road
To answer you question about replacing the OEM part with a Spruce part of unknown origin. You have to know what an approved part is.

Suspected Unapproved Part (SUP). A part, component, or material that is suspected of not meeting the requirements of an "approved part." A part that, for any reason, may not be "approved." Reasons may include findings such as a different finish, size, color, improper (or lack of) identification, and incomplete or altered paperwork. Reference AC 21-29.

The paper trail is very important on type certificated aircraft. The battery relay should come with a FAA Form 8130-3 showing it is a new part and where it was manufactured and under what process such as OEM or PMA.

If the Spruce part does not have traceability back to the manufacturer with PMA authority or is not OME it should not be installed.

And lastly the person approving or disapproving for return to service a type-certificated product must ensure that the required maintenance record entries comply with 14 CFR part 43, and therefore must include the following information:

1. Type of inspection and a brief description of the extent of the inspection.
2. Date.
3. Product hours, cycles, or life limits as applicable.
4. Signature, certificate number, and kind of certificate held by the person approving or disapproving for return to service.
5. The appropriate certifying statement that the product or part thereof, is approved or disapproved for return to service, as applicable.

Bottom line is if the Spruce part is not OEM or PMA do not install it. There is a reason it is a lot cheaper. It doesn’t meet the T/C standards.

Last edited by Denny of Oakland : 01-21-2008 at 03:17 PM.
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -5. The time now is 04:55 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.0.0